Overview
Live Optics Optical Prime currently has an option to include or exclude objects such as servers or VMs from a project. This functionality is found in the Performance tab tree menu. When this happens the recalculate button appears. Clicking this button recalculates the metrics for the entire project and should reflect only the values selected. The virtual tab had been excluded from this functionality.
Virtual Recalculation Fix
The virtual tab has been updated to be included in the recalculation processing. The virtual tab includes:
- Virtual Summary tab
- Physical Summary tab
- Graphs
- VM Resource Distribution
- Provision Contrast
- Over Provisioning
- Guest VMs table
Virtual Recalculation anomalies
Project information after the release date:
- Is Included bug – recalculation needed to correct the values
- Prior to 12/16/20 any projects that were previously recalculated will show inconsistent values in the virtual tab. To correct these values, the user must recalculate the project.
- Legacy Projects inconsistent values – recalculation will only occur for Virtual Tab Graphs
- For projects 1.5 years old (before July 2019), Virtual Summary, Physical Summary and Guest VM Table will not be updated after a recalculation. The Graphs tab charts will be recalculated causing the data to be inconsistent with the rest of the tabs/data.